top of page

selected projects             office             hospitality             residential             commerce             industry             planning

004.png
GMS School 1_200 detailed.jpg

St. Georg Primary and Secondary School with double gymnasium


On the over 15,000 m² plot of land south of the town centre, a new building with a double sports hall is being constructed (as a replacement for the primary and secondary school which has become too small and can no longer be renovated).

The floor plan of the four-story building is centered around a central atrium. This distinctive space connects all levels and also serves as a covered break room and assembly hall.

building owner

City of Bad Aibling

Draft

Obel Architects

Gross floor area above ground
approx. 13,000 m²

WH2230-1528-29.jpg
WH2230-1142-44.jpg
006.png
002.png
GMS School 1_200 detailed.jpg
Image32_001.png
School building, auditorium, Bad Aibling PSP.jpg
School building, auditorium, Bad Aibling PSP.jpg
2022-07-21 Construction Site 16_edited.jpg
2022-07-21 Construction Site 16_edited.jpg

Weltner Louvieaux Architekten GmbH

Meinekestraße 27
D-10719 Berlin

Tel.: +49 (0) 30 230 843 - 0

Email: mail(at)psp-wl.de

  • Instagram Icon, Weltner Louvieaux Architekten GmbH
  • LinkedIn Icon Instagram Icon, Weltner Louvieaux Architekten GmbH

We are a German-French architecture firm based in Berlin. With our international team, we realize projects
from a wide range of sectors. Our work encompasses new construction, conversions, and the renovation of existing buildings and listed buildings. We support our clients with great dedication and targeted expertise.

bottom of page